Showing posts with label MI. Show all posts
Showing posts with label MI. Show all posts

Wednesday, 9 March 2011

Running out of time

I am running out of time on MIA 2 we have T minus 6 hours until she jets off to Greece on the school trip.  I have half of two sleeves left to do along with sewing it up, doing the neck band and blocking it.  I also have to finish sewing the lining into the skirt.  With this shockingly short time frame before she walks out the door I just don't think it is going to happen so I am activating plan C for contingency.  I am slightly delusional but not totally.

Two fronts done.
As per normal when you have a deadline life has interrupted and having the great effect of dumping me on my arse.  I should have taken this project with me when I spent the 8 hours + waiting round the Southport hospital last week but I grabbed the easy grab my sock in progress bag.  I am also pretty sure the hubby would have spat the dummy at me knitting a jumper while in A&E.  Sock is acceptable but full-sized large project in public a little embarrassing for him in most places. 

Blocking of the MIA 1 project, Carnaby Skirt
Plan C.

  1. Finish inserting the lining into the skirt and making sure buttons are firmly attached.
  2. Step out of the way and let hubby and daughter do the packing of her bags.  Homicide is not an option but could be on the cards if I am involved in packing bags with daughter.
  3. Knit on sleeves but don't try and kill self to complete them tonight.
  4. Find an ice pack and bottle of rum for after daughter leaves at 2am tomorrow.
  5. Send text message to daughter tomorrow and remind her I want a decent photo of her in the skirt in Greece.

Monday, 28 February 2011

Mission Impossible 2

I managed to get the first mission impossible knitting project completed fairly rapidly (Saturday to Wednesday).  I started to look round at jackets to go with the skirts. The skirt is almost finished but I basically have to have some daylight hours with the blocked skirt, my sewing room and with myself together at the same time to put the skirt lining that daughter has requested into the finished knitted skirt.  She actually took the skirt up to the fabric shop without mother to get the lining and choose the buttons by herself. So now it is just a case of doing this finishing and then she will be set for Greece in less than three weeks actually almost two weeks.

Mission Impossible 2 is the creation of a matching jacket to go with this skirt.  For a while there I did not think I would get there but daughter finally made a decision on a pattern. Thanks to all those who suggested patterns but she has gone with a Kim Hargraves pattern called Darcy which I will have to do major adaptations to make sure I fit her almost Amazonian body. Well at 6'2", its Amazonian to me and now it is most definitely a knit down to the wire job.

In between the pattern decision making process I also managed to finish the possum yarn socks that I started earlier in the month. Said daughter has done that thing she does with all things that I knit which are green. She has gone "I Want" "Can I have please MOMMY!!!!!!!  Pretty Please??? When Zoec sent me the yarn I warned her that daughter would do this.  Zoec also suggested the pattern as well which is Cachoeira by Kristi Geraci.


Wangi - dont they look like waterfalls
I am halfway through the d pair of my a-z kal socks and want to get them finished before my yarn for the e pair arrives. I am only a couple of days behind but I think the MI2 knit the peplum moss stitch jacket also known as Darcy will cause the next pair of socks to run late as well. I think the name had something to do with the selection as Pride and Prejudice is also a well loved novel.  She even has the good taste to prefer the Colin Firth production.

Wednesday, 23 February 2011

Undertaking another mission impossible

On Saturday evening when I got home from work the daughter, Ry, pointed out that she has less than three weeks before she is off on a history trip to Greece with college.  She had been reviewing her wardrobe and as a result I had a new mission impossible.


Good evening, Kotaatok.

You mission Kota, should you decide to accept it is to knit your daughter a Carnaby Skirt by Nickiol Lohr. As always, should you or any of your knitting team be caught up in life or be swapped by work demands, the Knitting Collective aka Ravelry will disavow any knowledge of your actions.

This message will self-destruct when you have less than 10 rows to complete on the button bands.  


Good luck Kota.


So around work for the last couple of days I have been knitting panels of this skirt for her. I should of finished it last night but the mission impossible of the deadline and a sudden upswing in work demands has meant that I have been delayed a day. It is a quick knit and I am tempted to make more items like this possibly for me but not this pattern as I have an arse and womanly hips. Daughter also thought to throw some wrinkles into the pot when she worked out that I had another bag of yarn and wants something else to go with the skirt.  

The issue is what else? Even though some really good suggestions have been made by other Ravelers (Ravelry website users) Ry has not been that enthusiastic. Her responses have been classic teenage understatement of "That's nice". For those who don't remember the exact teenage tone and linguistic meaning it translates to "Fine mother but Never in Holy Hell will I wear it". Head desk moment before I revert to violence. I have a circular needle in my hands so I could garrotte her very very easily.